Specimens - Annexures to Construction Collaboration Agreement
ANNEXURE NO.1 Construction Specifications 1. Scope & General The following specification and provisions shall be adopted by the Second Party for the construction of Building No. ____________. All materials and workmanship shall conform broadly to CPWD / BIS standards unless otherwise specified and as directed by the Architect / Structural Engineer. 2. Structure The structure shall be a combination of load-bearing and framed construction, earthquake-resistant as per the structural design prepared by the Architect/Structural Engineer. Structural materials, reinforcement, and workmanship must conform to relevant BIS/CPWD specifications. Main materials (indicative): Cement: 53-grade, ISI-marked (e.g., UltraTech , JK, ACC, Ambuja, Binani). Bricks: First-class, high-quality bricks. Coarse sand: First-class (Badarpur/stone dust as specified). Fine sa...